2012 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting
(for time see Bid/Proposal Document) |
Addenda |
Bid Summary / Award |
RFQ 15-13
Engineering Services
Pease Wastewater Treatment Facility Evaluation  |
December 13, 2012 |
|
Pre-Proposal Meeting is November 20,2012. |
Addendum #1 |
|
RFP 17-13 Engineering & Design Services Streetscape Improvements - Ranger Way Atlantic Heights |
December 4, 2012 |
|
Mandatory pre-proposal meeting is November 27, 2012 |
|
|
RFP 19-13 Wayfind Program |
November 29, 2012 |
|
Optional pre-proposal meeting is November 14, 2012 |
Addendum #1 |
|
Bid 10-13 Type III Ambulance  |
November 5, 2012 |
|
|
|
|
RFP 13-13 Annual Elevator Maintenance  |
November 1, 2012 |
|
|
|
|
RFQ 18-13 Professional Planning Services for Form-Based Code for Downtown  |
October 25, 2012 |
|
|
Addendum #1
|
|
Bid 12-13 Water Inventory  |
October 22, 2012 |
|
|
|
Various |
Bid 11-13 Sewer Inventory  |
October 22, 2012 |
|
|
|
Various |
Bid 08-13 Sale of Surplus Vehicles/Equipment |
September 12, 2012 |
|
|
|
Various |
RFQ #03-13, Water and Wastewater System Rate Study |
August 30, 2012 |
|
|
|
Municipal & Financial Services Group |
Bid 04-13 Six Month Chemical Bid |
August 29, 2012 |
|
|
|
Various |
Bid 07-13 Coakley Rd. & Cottage St. Sidewalk Connection
07-13 Drawings |
August 29, 2012 |
All requests for mailed documents must be accompanied by an additional fee of $10.00 to cover the cost of postage and handling.
Copies of the plans and specs may be picked up at the Purchasing Department, 3rd floor, City Hall.
Please contact Lori MacGinnis,Purchasing Coordinator
at (603) 610-7227 with questions. There is a
non-refundable $20.00 fee for hard copies. There is an extra $10.00 fee for mailed copies. |
|
|
Bourassa Const., LLC |
Bid 06-13 Fire Station 2 Apparatus Floor |
August 27, 2012 |
|
|
Addendum #1
Addendum #2 |
Northeast Safe-T- Solutions, Inc. |
Bid 05-13 Marcy Street Roadway and Sidewalk Construction
Bid 05-13 Plans |
August 27, 2012 |
The bid due date is
now August 21, 2012.
Hard copies of the plans and specs may be picked up Thursday August 2, 2012 or later, at the Purchasing Department, 3rd floor, City Hall.
Please contact Lori MacGinnis,Purchasing Coordinator
at (603) 610-7227 with questions. There is a
non-refundable $20.00 fee for hard copies.
|
August 10, 2012 |
Addendum #1 |
Santorelli Construction |
Bid 34-12 Market St. Roadway Improvements |
August 13, 2012 |
Plans are available for this project.
by clicking here (4 mb)
or can be picked up at the Purchasing Department, 3rd floor, City Hall.
Please contact Lori MacGinnis,Purchasing Coordinator
at (603) 610-7227 with questions. |
|
Addendum #1 |
Pike Industries |
Bid: The Portsmouth School Department is accepting quotes for printing needs for the 2012/13 school year |
July 20, 2012 |
Main Contact: Amy Noble (603) 431 5080 |
|
|
|
Re-Bid 38-12
Portsmouth Middle School Technology Equipment
Contact 
Contact is Steve Bartlett, Portsmouth School Department |
July 11, 2012 2 P.M. |
Deadline for questions is July 5, 2012.
|
|
|
|
Bid #40-12 Maynard Park Fence Replacement Atlantic Heights  |
July 9, 2012 |
|
|
Addendum #1 Sketch
Addendum #2 |
Four Seasons Fence |
RFP #41-12 Natural Gas Supply
|
July 2, 2012 |
|
|
|
Glacial Energy |
Bid #24-12 - Intransa Storage Appliance
|
June 28, 2012 |
|
|
|
ADT/Tyco |
Bid #37-12 - Plains Park Improvement Project
|
June 28, 2012 |
|
A mandatory pre-bid meeting will be held Friday, June 15, 2012 |
Addendum #1
Addendum #2 |
Santorelli Construction |
Bid #01-13 - Annual Fuel Bid
|
June 27, 2012 |
|
|
|
Hanscom's Truck/Dennis K. Burke |
RFP - PORTSMOUTH SCHOOL DEPARTMENT
RUBBISH REMOVAL
|
June 26, 2012 |
|
|
|
|
Bid #33-12 - Woodbury & Durgin Intersection Improvements
|
June 26, 2012 |
|
|
|
Bourassa Const., LLC
|
Bid 39-12 South End Paving Support
|
June 8, 2012 |
|
|
|
Bourassa Const., LLC |
Bid 29-12 I95 & Market Street Traffic Signage  |
May 30, 2012 |
|
|
|
Roadsafe Traffic |
RFP 30-12 High Hanover Garage Security Guard  |
May 24, 2012 |
|
|
|
|
Bid Cass Street Area Sewer Improvements  |
May 10, 2012 |
This bid is only open to pre-qualified contractors |
|
|
Albanese D&S |
Bid 31-12 Coastal Resilience Initiative  |
April 30, 2012 |
|
|
Addendum #1 |
Rockingham Planning Commission |
Bid 23-12 Boilers and Cooling Towers Equipment Treatment Programs  |
April 20, 2012 |
|
|
|
Cascade Water |
Bid 28-12 Portsmouth City Hall Boiler Plant Building Improvements  |
April 9, 2012 |
Pre-bid meeting attendees  |
March 27, 2012 |
Addendum #1
Addendum #2
Addendum #3
|
Ricci Construction |
Bid 27-12 Mobile Vending From Municipal Spaces  |
March 30, 2012 |
|
|
|
No Bids Received |
Lincoln Ave. Contract 3B Pre-qualification  |
March 22, 2012 |
This bid is only open to pre-qualified contractors |
|
Addendum #1 |
|
Portsmouth School Department ORGANIC ATHLETIC FIELD APPLICATION(s) AND
SYNTHETIC TURF MAINTENANCE.  |
March 21, 2012 |
Main Contact: Ken Linchey (603) 431 5080 ext. 251 |
|
|
|
Bid 21-12 Six Month Chemical Bid  |
February 14, 2012 |
|
|
|
Various |
Lincoln Ave. Contract 3B Pre-qualification  |
January 26, 2012 |
|
|
|
Albanese Brothers, Inc. |
RFQ 19-12
Construction Management Services for
Renovation of Portsmouth Municipal Complex  |
January 26, 2012 |
City Hall Layout 
Attendees - Preproposal meeting
|
January 19, 2012 |
Addendum #1
Addendum #2
|
Ricci Const. |
BID 18-12 Sale of Police Department's
Uninterrupted Power Supply
Surplus Equipment  |
January 18, 2012 |
|
|
|
No Bids Received |
RFP 17-12 Multi Function Device (Copy Machine)  |
January 10, 2012 |
|
|
Addendum #1
Addendum #2
Addendum #3 |
Ikon Office Products |
|
2011 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting
(for time see Bid/Proposal Document) |
Addenda |
Bid Summary / Award |
RFP 14-12 Annual Services Contract – Comprehensive Services for Emergency Generator Systems  |
Dec. 7, 2011 |
|
Nov. 23, 2011 |
Addendum #1 |
FM Generator |
RFP 14-12 Annual Services Contract – Comprehensive Services for Emergency Generator Systems  |
Dec. 7, 2011 |
|
Nov. 23, 2011 |
Addendum #1 |
|
RFQ 06-12
Engineering Services
Water System Distribution Storage Tank Assessment,
Hydraulic Model Update, And Long-Range Capital
And Operational Plan  |
November 17, 2011 |
|
|
|
Tighe & Bond |
RFQ 16-12 Planning and Permitting Management Software  |
November 15, 2011 |
|
|
Addendum #1 |
|
RFP 15-12 Snow Removal Services  |
November 9, 2011 |
|
|
|
William Renaud Trucking |
Bid #09-12 Middle Road Sidewalk Improvements  |
September 20, 2011 |
|
|
|
C.S.S.I. |
RFP 11-12 Household Hazardous Waste Collection Services  |
September 16, 2011 |
|
|
Clarification |
Clean Harbors |
Bid 12-12 Police Department Cruiser Laptops
Bid due date is September 16, 2011  |
September 16, 2011 |
|
|
|
Transcor |
Bid 10-12 State Street Streetscape Improvements  |
September 14, 2011 |
Project Plans. (Hard copy of plans are available - see bid document). |
|
Addendum #1 |
Santorelli Const. |
Bid 08-12 Six Month Chemical Bid  |
August 26, 2011 |
|
|
|
Various |
RFP 02-12 PARKING SUPPLY AND DEMAND ANALYSIS FOR DOWNTOWN PORTSMOUTH, NH  |
August 25, 2011 |
|
August 11, 2011 |
Addendum #1 |
Nelson/Nygaard |
Bid 05-12
High/Hanover Parking Facility Maintenance Project  |
August 10, 2011 |
|
|
|
Charter's Brothers, Inc. |
Bid: 03-12 2011 Portsmouth Library Nana Wall System Project |
August 9, 2011 |
|
August 1, 2011 |
Addendum #1 |
Careno Construction |
Bid: The Portsmouth School Department is accepting quotes for printing needs for the 2011/12 school year |
July 20, 2011 |
Main Contact: Amy Noble (603) 431 5080 ext. 235 |
|
|
|
Bid 45-11 Dondero Roof Replacement
|
July 7, 2011 |
|
June 27, 2011 |
Addendum #1 |
H.L Patten Const. |
Bid 37-11 Water Inventory
|
July 6, 2011 |
|
|
|
Various |
Bid 47-11 Sale of Surplus Vehicles
|
June 28, 2011 |
|
|
|
Various |
RFP 49-11 Special Needs Student Transportation Services
|
June 22, 2011 |
|
June 9, 2011 |
Addendum #1 |
The Provider |
Bid 36-11A Sewer Inventory
|
June 14, 2011 |
|
|
|
Various |
RFP 48-11 Student Transportation Services
|
June 22, 2011 |
|
June 9, 2011 |
Addendum #1 |
Goffstown Truck Center |
Bid 46-11 Pavement Markings
|
June 20, 2011 |
|
|
|
Hi-Way Safety Systems |
Bid 01-12 Annual Fuel
|
June 17, 2011 |
|
|
|
Hansom's Truck
Stop & Dennis K. Burke |
BIDS: The Portsmouth School Department is
accepting bids for Repair Service Contracts for:
Plumbing, Electrical and Power Plant Repairs.
|
June 15, 2011 |
Main Contact: Steve Bartlett (603) 431-5080 exc. 223 |
|
|
|
Bid 38-11 Maple Haven Drainage Improvements
|
June 15, 2011 |
Copy of plans are available at
Infinite Imagaing 933 Islington Street Portsmouth, NH 08301
Phone Number: 603-436-3030
www.infiniteimaging.com |
June 6, 2011 |
Addendum #1 |
Gove Construction |
Bid 36-11 Sewer Inventory
|
June 2, 2011 |
|
|
|
|
Bid 41-11 Police Dept. Cruiser Laptops
|
June 1, 2011 |
|
|
Addendum #1
Addendum #2 |
Tech Depot |
Bid 43-11 City Hall Boiler
|
May 24, 2011 |
Pre-Bid Sign In sheet
Plans
Copy of plans are available at
Infinite Imagaing
933 Islington Street
Portsmouth, NH 08301
Phone Number: 603-436-3030
www.infiniteimaging.com
|
May 12, 2011 |
Addendum #1 |
All All Bids Rejected |
Bid 42-11 High School Bleachers Replacement
|
May 13, 2011 |
|
May 6, 2011 |
|
Chaters Brothers |
RFP# 44-11 GRINDING, HAULING & DISPOSING (RECYCLING) OF BRUSH MATERIAL
|
May 11, 2011 |
|
|
|
Aggregate Recycling |
Bid 34-11 Annual Paving
|
April 28, 2011
|
|
|
|
Pike Industries |
Bid 39-11 PW Equipment
|
April 25, 2011
|
|
|
Addendum #1 |
H.P. Fairfield |
Bid 40-11
Atlantic Heights Streetscape Improvements Concord Way & Porpoise Way
|
April 21, 2011
|
Full Size Plan Set (6mb)
Hard copy of plans are available - see bid document. |
April 7, 2011 |
Addendum #1
Addendum #2 |
Jeremy Hiltz
Excavating |
Bid 30-11 Mobile Vending From Municipal Spaces
|
April 5, 2011
|
|
|
|
No Bids Received |
Bid 22-11 City Hall Elevator Improvements
|
March 29, 2011 |
Bid due date has been changed, see Addendum #2 |
March 17, 2011 |
Addendum #1
Addendum #2
Addendum #3 |
Embree White |
RFP 33-11
Engineering services
Mechanic Street Seawall at Pickering - Design Project
|
March 24, 2011.
|
|
|
|
Vine Associates |
Bid 32-11 McDonough Street Area 2 Improvements
|
March 21, 2011 |
|
|
|
Lyman |
Bid 28-11 Indoor Thermal Pool Blanket System
|
March 18, 2011 |
|
|
|
Not Awarded |
Bid 25-11 Atlantic Heights Streetscape Improvements Concord Way & Porpoise Way
(6 MB) |
March 17, 2011 |
Bid due date has been changed to
March 18, 2011 @ 3:00 p.m.,
See Addendum #4
Full Size Plan Set (6mb)
Hard copy of plans are available. See Clarification |
Pre-bid meeting is March 7, 2011 at 10:30 a.m. |
Construction Manual Rev 3 (1mb)
Addendum #1
Addendum #2
Addendum #3
Addendum #4
|
Not Awarded - all bids rejected |
Bid 31-11 Public Works Mowers  |
March 7, 2011 |
|
|
Addendum #1
Addendum #2 |
Stills Power |
RFP # 27-11 GREASE TRAP INSPECTION, PUMPING, HAULING & DISPOSAL (RECYCLING) - PILOT PROJECT  |
March 22, 2011
|
RFP due date has been changed to
April 7, 2011 at 4:00 p.m.
Second Pre-Proposal Meeting is
March 31, 2011 at 11:00 a.m.,
See Addendum #1 |
March 8, 2011 at 11:00 a.m. |
Addendum #1 |
Wind River |
Bid 29-11 POLICE DEPARTMENT CRUISERS  |
February 22, 2011 |
|
|
|
Grappone Ford |
Bid 26-11 Six Month Chemical Bid  |
February 10, 2011 , |
|
|
|
various |
Bid 0-11
Bicycle Rack Concrete Pads Safe Routes to School  |
February 17, 2011 |
|
|
|
|
Bid 21-11
Public Works Department Downtown Street LightsBid #21-11  |
February 9, 2011
|
|
|
|
Northeast Electrical |
Bid 18-11 Police Department – Eaton Powerware UPS and Extended Battery Module  |
January 4, 2011 |
|
|
Addendum #1 |
Power Systems |
|
2010 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting
(for time see Bid/Proposal Document) |
Addenda |
Bid Summary / Award |
Bid 19-11 Snow Plowing/Removal services - City of Portsmouth Municipality and the Portsmouth School Department |
December 10, 2010 |
|
|
|
Renaud Trucking |
Bid 17-11 OPERATIONAL AUDIT OF THE POLICE DEPARTMENT  |
November 23, 2010, 2010
|
|
|
|
Public Safety Strategies Group |
Bid 16-11 POLICE DEPARTMENT CRUISERS  |
October 25, 2010
|
|
|
Addendum #1 |
Hillsboro Ford |
RFP 11-11 Elementary School Facilities Needs Assessment  |
October 15th, 2010 |
CLARIFICATION |
October 7, 2010 |
|
Dore & Whittier |
RFQ 15-11 Wastewater Master Plan -Piloting Effort  |
October 14th, 2010 |
|
|
|
|
Bid 14-11 High Hanover Parking Facility Maintenance Projects Bid due date and time is 2:00 p.m., September 29, 2010  |
September 29, 2010 |
|
|
Addendum #1 |
Charters Brothers |
Bid 13-11 McDonough Street Area 1 Improvements
Bid due date and time is 2:00 p.m., September 23, 2010  |
September 23, 2010 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for the drawings to this project. |
September 17, 2010 |
Addendum #1 |
JAMCO |
Bid 10-11 South Mill St. & Mechanic St. Seawall Reconstruction |
September 9, 2010 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for the drawings to this project. |
September 1, 2010
|
Addendum #1 |
Prock Marine Co. |
RFP 03-11 Annual Services Contract – Comprehensive Services for Emergency Generator Systems |
September 2, 2010 |
|
Generator Site Visit:
August 19, 2010
|
Addendum #1 |
FM Generator |
Bid 09-11 Six Month Chemical Bid |
August 17, 2010 |
|
|
|
Various |
RFP 08-11 ENGINEERING SERVICES Bellamy Reservoir Dam – Madbury Breach Analysis and Emergency Action Plan Update |
August 9, 2010 |
|
|
|
H.L. Turner |
RFP 50-10 Manufactured Home Water Meter Upgrade |
July 29, 2010 |
|
Pre-proposal meeting is July 21, 2010 |
|
Regan Electric |
Bid 05-11 Sale of Surplus Vehicles |
July 13, 2010 |
|
|
|
Various |
Bid 06-11 Testing and Special Inspections for the Middle School |
July 9, 2010 |
|
|
|
John Turner Consulting |
Bid Lincoln Avenue Area Sewer Separation – Contract #3A  |
July 1, 2010 |
This bid is only open to pre-qualified contractors |
June 17, 2010 |
|
|
Bid 01-11 Annual Fuel |
June 28, 2010 a |
|
|
|
Hanscom Truck Stop |
Bid: The Portsmouth School Department is accepting quotes for printing needs for the 2010/11 school year |
June 23, 2010 |
Main Contact: Steve Bartlett (603) 431 5080 ext. 223 |
|
|
|
RFP 51-10 Flagging Services |
June 18, 2010 |
|
|
Addendum #1 |
American Flagging |
Bid 38-10 High/Hanover Parking Facility Stairtower Project |
June 10, 2010 |
|
|
Addendum #1 |
Charters Brothers |
Bid 33-10 Water Inventory |
May 21, 2010 |
|
|
|
various |
RFP 49-10 Middle School Building Systems Commissioning |
May 20, 2010 |
|
May 12, 2010 |
Addendum #1
|
SMRT |
RFP 40-10 Annual Lawn Restoration |
May 17, 2010 |
|
|
|
Salmon Falls |
RFP 48-10 Engineering Services “Maple Haven Area Drainage Upgrade Project |
May 3, 2010 |
|
|
Grahics |
Altus Engineering |
PRE-QUALIFICATION OF CONTRACTORS
Lincoln Area Sewer Separation Contract #3A  |
April 29, 2010 |
|
|
|
|
Bid 36-10 Annual Paving |
April 28, 2010 |
|
|
Addendum #1
Addendum #2 |
|
RFP 37-10 Perice Island Signs - Design, Manufacture and Installation Project |
April 20, 2010 |
|
pre-proposal mandatory April 6, 2010 |
Addendum #1 |
Wood & Wood Sign Systems |
Bid 42-10 South at Lafayette Intersection Improvements |
April 13, 2010 |
|
|
Addendum #1
Addendum #12 |
New England Signals |
Bid 45-10 Market Street Streetscape Improvements |
April 6, 2010 . |
|
March 26, 2010 |
Addendum #1 |
Santorelli Construction |
Bid 34-10 Sewer Inventory |
April 5, 2010 |
|
|
|
various |
Bid 46-10
Mobile Vending from Municipal Spaces |
April 1, 2010 |
|
|
Addendum #1 |
NO BIDS RECEIVED |
Bid 43-10 Downtown Street Lights  |
March 25, 2010 |
|
|
|
Rockingham Electrical Supply Co. |
Bid 44-10
2010 Improvements to Pine Street Park  |
March 19, 2010 |
|
March 9, 2010 |
Addendum #1 |
Grounds Care Unlimited |
RFP #41-10 Engineering & Design Services
Streetscape Improvements - Concord & Porpoise Ways
Atlantic Heights  |
February 19, 2010
|
|
February 11, 2010 |
Addendum #1 |
Gorrill Palmer |
Bid 35-10 Six Month Chemical Bid  |
February 16, 2010 |
|
|
|
various |
BID 32-10 Sagamore Bridge Repairs  |
February 2, 2010
|
|
January 21, 2010 |
Addendum #1 |
Wyman & Simpson |
Bid 28-10 Little Harbor School Asbestos Ceiling Tile Removal  |
February 1, 2010
|
|
January 25, 2010 |
Addendum #1 |
A Best Abatement |
BID 25-10 Sale of Surplus Vehicles  |
February 1, 2010
|
|
|
Addendum #1 |
various |
RFQ 29-10 Call for Artists - Design, execute and install Public Art sculpture
At New Fire Station 2  |
January 22, 2010 |
|
|
|
All bids rejected |
RFQ 30-10 Construction Management Services for the Renovation and Expansion of Portsmouth Middle School  |
January 6, 2010 |
|
|
|
Gilbane |
|
2009 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting
(for time see Bid/Proposal Document) |
Addenda |
Bid Summary / Award |
RFQ 20-10 Wastewater Master Plan - Value Engineering Review  |
December 23, 2009, 2009
|
|
|
|
|
Bid 27-10 Leak detection system  |
December 22, 2009, 2009
|
|
|
Addendum #1 |
Gutermann, Inc. |
Bid 26-10 Rain Barrels  |
December 22, 2009 |
|
|
Addendum #1 |
Verde Strategies, LLC |
RFQ #24-10 Fundraising Services - Request for Qualifications  |
December 11, 2009, 2009
|
|
|
Addendum #1  |
not awarded |
RFP 23-10 Snow Removal Services  |
November 18, 2009
|
|
|
|
various |
RFP 21-10 MUNICIPAL SOLID WASTE SERVICES  |
November 9, 2009
|
RFP Due Date has been changed to November 16, 2009 @ 2:00 p.m. |
|
Addendum #1  |
|
RFP 22-10 Engineering & Design Services, Peirce Island Trails  |
November 16, 2009
|
|
|
Addendum #1 
Addendum #2 
Addendum #3
Addendum #4
Addendum #5  |
All bids rejected |
RFP 13-10 Elevator Service Maintenance  |
November 12, 2009
|
|
|
Addendum #1 
|
Stanley Elevator |
RFP 19-10 Police Cruisers  |
November 10, 2009
|
|
|
|
Hillsboro Ford |
RFP 17-10 Seacoast Planning & Implementation Evacuation Services Procedure  |
October 28, 2009
|
RFP Due Date has been changed to November 4,2009
@2:00p.m. |
|
Addendum #1 
Addendum #2 |
Louis Berger Group |
Bid 15-10 DPW 2nd Floor Window Installation  |
October 27, 2009
|
|
October 20, 2009 |
|
Northway Builders |
Bid 18-10 T - Shirts "Safe Routes to School  |
October 13, 2009 |
|
|
Addendum #1  |
Screen Company |
Bid 14-10 Improvements to Pine Street Park Project  |
October 2, 2009 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for the drawings to this project. |
September 24, 2009
|
|
|
RFP 16-10 Engineering & Design Services Maplewood Ave. Bridge Reconstruction  |
September 28, 2009 |
|
|
Addendum #1 
|
Waterfront Eng. |
Bid 09-10 Peirce Island Bridge Rail Replacement Project  |
September 29, 2009 |
|
September 22, 2009
| Addendum #1  |
Wyman & Simpson |
Bid 07-10 Wasterwater Buildings Roof Replacements  |
September 10, 2009 |
|
September 1, 2009
| Addendum #1 
|
MC Contracting |
Bid 08-10 Wide Area Mower  |
August 28, 2009 |
|
|
|
James Rosencrantz & Sons |
Bid 11-10 Bow - Ceres Sts. Waterfront Improvements  |
August 25, 2009 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a drawings.
Bid due date has changed see addendum #2
August 18, 2009 at 9:00 a.m. |
|
Addendum #1 
Addendum #2
Addendum #3
|
Lyman |
Bid State Street Utilities and Roadway Improvements  |
August 20, 2009 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
August 11, 2009
| Addendum #1
Addendum #2 |
|
Bid 06-10 Semiannual Chemical Bid  |
August 14, 2009 |
|
|
|
Various bidders |
Bid Bartlett Street Area Sewer Improvements  |
August 14, 2009 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
July 30, 2009
|
|
Albanese Brothers |
Bid 04-10 Bethel Assembly Parking Lot Repairs  |
August 7, 2009 |
|
|
Addendum #1 |
Bourassa |
Bid 02-10 South Meeting House Repairs  |
August 6, 2009 |
|
July 21, 2009
| Addendum #1
Addendum #2
|
Charters Brothers |
Bid #58-09 Press Box  |
July 23, 2009 . |
|
July 16, 2009 |
Addendum #1
Addendum #2 |
Careno Construction |
RFP 05-10 Pay and Display Parking Meters  |
July 22, 2009 |
|
|
Addendum #1 Questions And Answers |
Cale |
RFP 03-10 MUNICIPAL STORMWATER UTILITY FEASIBILITY STUDY  |
July 13, 2009 |
Technical questions must be addressed to Silke Psula by July 2, 2009.
Her contact information can be found in the Invitation to Propose. |
|
|
AMEC Earth |
RFP 57-09 Statistical update – commercial/industrial properties  |
June 26, 2009 |
|
|
|
Property Valuation Advisors |
Bid 01-10 Annual Fuel  |
June 19, 2009 |
|
|
|
Hometown Oil & Dennis K. Burke |
Bid 56-09 MUNICIPAL COMPLEX FIRE ALARM  |
June 18, 2009 |
Bidders are required to contact Dan Hartrey at 603-610-7299 to confirm attendance at the meeting. |
Friday, June 12, 2009 |
Addendum #1
|
Tri-State Fire |
Bid 44-09 Raleigh Way Phase II & III  |
June 10, 2009 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
June 3, 2009 |
Addendum #1
Addendum #2 |
John Lyman & Sons |
Bid 59-09 Scum and Grease Removal  |
June 5, 2009 |
|
|
|
Strewarts Septic |
Bid 53-09 High-Hanover Parking
Facility Security Guard  |
June 3, 2009 |
|
|
|
Day & Zimmerman |
Bid 55-09 Middle Street Sidewalks Phase II  |
May 4, 2009 . |
|
|
|
John Lyman & Sons |
Bid 50-09 PW Highway Dept. Trucks  |
April 16, 2009 |
|
|
|
Liberty Chevrolet & Ron Currier |
Bid 49-09 Annual Lawn Restoration  |
April 9, 2009 |
|
|
|
Grounds Care |
Bid 45-09 Type III Ambulance  |
April 9, 2009 |
|
|
|
Professional Vehicles |
Bid 54-09 Annual Paving  |
April 7, 2009 |
|
|
Addendum #1 |
Pike Industries |
Bid 52-09 Police Dept. Animal Control Ford Ranger  |
April 3, 2009 |
|
|
|
Casco Bay Ford |
Bid 08-09 Spinnaker Pt. Concrete Repairs  |
April 1, 2009 |
|
pre-bid meeting on March 20, 2009 |
Addendum #1 |
Santorelli Construction |
RFP 29-09- Pierce Island Bridge Rail Replacement  |
April 1, 2009 |
|
pre-proposal mandatory meeting on March 17, 2009 |
Addendum #1 |
CLD Engineers |
RFP 48-09 - Online Payment System (OPS)  |
March 27, 2009 |
DUE DATE HAS CHANGED ADD#1&2 |
|
Addendum #1
Addendum #2
Addendum #3
Addendum #3 follow-up questions |
No Award |
RFP 30-09 - Safe Routes to School Travel Plan Study  |
March 24, 2009 |
|
|
|
Alta Planning |
RFP 47-09 - Weed Control, Turf Management  |
March 23, 2009 |
|
|
|
|
Bid 46-09 - Market Squre Handicapped Ramp Project  |
March 23, 2009 |
Clairification |
|
|
Gove Construction |
RFP - Athletic Field Application  |
March 6, 2009 |
Call (603) 431-5080 ext. 223 |
|
|
|
RFP - Athletic Field Grounds Care and Mowing  |
March 6, 2009 |
Call (603) 431-5080 ext. 223 |
|
|
|
RFP 42-09 Undeveloped Lands Assessment  |
March 6, 2009 |
|
Pre-proposal meeting is February 18, 2009 |
|
West Environmental |
MADBURY WATER TREATMENT PLANT UPGRADE AND BELLAMY RESERVOIR IMPROVEMENTS  |
MARCH 5, 2009 |
|
A mandatory pre-bid conference will be held on February 6, 2009 at the Madbury Water Treatment Plant located at 61 Freshet Road, Madbury, NH. |
Addendum #1
Addendum #2
Addendum #2 - structural drawings 
Addendum #3
Addendum #4 |
Penta Corporation |
RFP 41-09 In-Vehicle Parking Payment System  |
February 20, 2009 |
|
|
|
E-Park |
BID 35-09 Semiannual Six Month Chemical  |
February 19, 2009 |
|
|
|
Various Vendors |
Bid 43-09 Police Department Laptops  |
February 18, 2009 |
|
|
Addendum 1
Addendum 2 |
En Pointe Technologies |
Bid 36-09 Sewer Inventory Bid  |
February 17, 2009 |
|
|
|
Various Vendors |
BID 37-09 Water Inventory Bid  |
February 10, 2009 |
|
|
|
Various Vendors |
RFQ 38-09 Comprehensive Recreational Needs Study  |
February 3, 2009 |
|
|
|
TAT - The Architectural Team |
Bid 40-09 POLICE DEPARTMENT ANIMAL CONTROL - FORD RANGER  |
January 16, 2009 |
|
|
|
all bids rejected |
Bid 39-09 POLICE DEPARTMENT CRUISER  |
January 16, 2009 |
|
|
|
Stoneham Ford |
Bid 14-09 School Door Replacements  |
January 9, 2009 |
|
December 29, 2008 |
Addendum #1 |
Careno Construction |
RFP 33-09 Finance Department, Folding/Inserting Machine  |
January 5, 2009 |
|
|
|
Neopost |
|
2008 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting
(for time see Bid/Proposal Document) |
Addenda |
Bid Summary / Award |
Bid 31-09 Bike Racks for Little Harbour, St. Patrick and the Middle School  |
December 9, 2008 |
|
|
|
Dero Bike |
Bid 24-09 School Crossing Crosswalk Safety Signs  |
December 8, 2008
at 2:30 p.m. |
|
|
|
Hi-Way Safety |
RFP 20-09 Snow Removal Services  |
November 13, 2008 at 2:00 P.M. |
|
|
|
JAMCO & Renaud Trucking |
Bid 15-09 REQUEST FOR PROPOSALS
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING & DESIGN SERVICES
TWO CITY PARKS: PLAINS AND PINE STREET PLAYGROUNDS  |
October 30, 2008 at 2:00 P.M. |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
Pre-bid October 16, 2008 |
Addendum #1 |
Weston & Sampson |
|
October 29, 2008 at 2:30 p.m. |
|
|
|
Various bidders |
|
October 24, 2008 at 2:30 p.m. |
|
|
|
bids rejected |
|
October 24, 2008 at 2:45 p.m. |
|
|
|
bids rejected |
|
October 22, 2008 at 2:30 p.m. |
|
|
Addendum #1 |
Hascall & Hall |
|
October 17, 2008 |
|
|
|
Amano McGann, Inc. |
|
October 17, 2008 |
Main Contact: Steve Bartlett (603) 431 5080 |
|
|
|
Bid 07-09 Gates Street Reconstruction Project |
October 10, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
Pre-bid meeting is October 3, 2008 @ 10:00 a.m. |
Addendum #3 |
Gove Constr |
|
September 22, 2008 |
|
|
|
No bids received |
|
September 18, 2008 |
|
|
|
HP Fairfield |
|
September 18, 2008 |
Gun Club address: 305 Greenland Road, Portsmouth, NH. Questions may be addressed to Dave Allen at 703-766-1421. |
|
Clarification Questions & Answers |
Danley Demolition |
|
September 15, 2008 |
|
|
|
Clean Harbors |
|
August 28, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
Mandatory Pre-bid meeting August 14, 2008 at 10:00 a.m. |
Addendum #1
|
|
|
August 12, 2008
|
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
July 22, 2008 at 10:00 a.m. |
Addendum #1
Addendum #2 |
R.S. Audley
|
|
August 8, 2008 |
|
|
|
Kohlhase Electric
|
|
August 6, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 |
|
Addendum #1 |
John Lyman & Sons |
|
July 30, 2008 |
|
|
|
Hilltop Chevrolet
|
|
July 25, 2008 |
|
|
|
East Coast Electronics Recycling
|
|
July 11, 2008 |
|
|
Addendum #1 |
All bids rejected, re-bid as #12-09
|
|
July 18, 2008 |
|
Pre-bid meeting is July 08, 2008 at 9:00 a.m. |
|
Hart Plumbing & Heating, Inc. |
|
July 3, 2008 |
|
|
|
Cascade Water Services Inc |
|
July 31, 2008 |
This bid is only open to pre-qualified contractors.
|
Pre-bid meeting is July 24, 2008 at 10:00 a.m. |
Addendum #1
Addendum #2 |
|
|
June 27, 2008 |
Main Contact: Steve Bartlett (603) 431 5080 ext 223 |
|
|
|
|
June 23, 2008 |
|
|
|
Dennis K. Burke and Hometown Oil
|
|
May 28, 2008 |
|
|
|
|
|
May 23, 2008 |
|
|
|
|
|
May 22, 2008 |
|
Mandatory Pre-Proposal Meeting is: May 6, 2008 @ 10:00 a.m. |
|
CMA Engineering |
Bid #53-08 Public Works - Sewer Division Truck #65 Combination Sewer Cleaner  |
April 28, 2008 |
|
|
|
C.N. Wood |
Bid #30-08 “Six-inch Portable Trash Pump”  |
April 7, 2008 |
|
|
|
Godwin Pumps |
Bid # 48-08 Maintenance Garage Infrared Heaters  |
April 9, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package.
|
Tuesday, March 25, 2008 at 10:30 a.m.
Bidders will meet in front of the Portsmouth Public Works lobby, 680 Peverly Hill Road. |
Addendum #1
|
Weston & Sampson Engineers |
Bid #47-08, Market Street Downtown Sidewalk Project  |
April 4, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package.
|
There will be a mandatory on-site pre-bid meeting on March 28, 2008 at 10:00 AM. Bidders and the City will meet on site. |
|
Santorelli Const. |
Bid #50-08 Surplus Vehicles  |
April 2, 2008 |
Interested bidders may view the Public Works vehicles/equipment between the hours of 10:00 a.m., and 2:00 p.m., on March 25, 2008 at the Public Works Facility. |
|
|
Various |
RFP# 46-08 Testing, Special Inspections, and Subsurface Explorations.  |
March 28, 2008 |
|
|
Addendum #1
|
|
Bid #40-08 Raleigh Way Streetscape Improvements
Phase 1 |
March 26, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
mandatory pre-bid meeting on March 13th, 2008 at 10:00 a.m. |
Addendum #1 |
John Lyman & Sons |
Bid #18-08 Little Harbor Replacement Windows |
March 17, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
Mandatory Pre-bid meeting is: March 3,2008 @ 3:30 p.m. |
Addendum #1
|
NH Glass |
RFP #44-08 Enterprise Asset Management Software and Services.  |
March 14, 2008 |
All questions by as to the interpretations of the RFP must be submitted in writing to: Lori MacGinnis, Purchasing Coordinator, 1 Junkins Avenue, Portsmouth, NH 03801, by March 6, 2008. |
|
Addendum #1
Addendum #2 |
VueWorks |
Bid #45-08 Public Works Department Downtown Street Lights  |
March 11, 2008 |
|
|
Addendum #1
|
Rexel |
Bid #41-08 Maintenance Garage Roof Replacement  |
February 25, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
Mandatory Pre-bid meeting is: Feb. 14, 2007 @ 12:00 p.m. |
Addendum #1
Addendum #2
Addendum #3 |
Progressive Roofing |
Bid #13-08 Roof Replacement Projects |
February 25, 2008 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package. |
Mandatory Pre-bid meeting is: Feb. 14, 2008 at 12:30 p.m. |
Addendum #1
Addendum #2
Addendum #3 |
Progressive Roofing |
RFP #42-08 Cama System Conversion  |
February 15, 2008 |
No |
No |
No |
Vision Appraisal |
Bid #38-08 Annual Chemicals  |
February 1, 2008 |
No |
No |
No |
Various |
Bid #33-08 Water Inventory  |
January 25, 2008 |
No |
No |
No |
Various |
Bid #32-08 Sewer Inventory  |
January 25, 2008 |
No |
No |
No |
Various |
RFP #39-08 PREQUALIFICATION STATEMENTS for the construction of: Bartlett Areas Sewer Improvements  |
January 25, 2008 |
No |
No |
No |
|
Bid #35-08 Wastewater Treatment Plant Truck S-14  |
January 7, 2008 |
No |
No |
No |
Hilltop Chevrolet |
Bid #36-08 Wastewater Treatment Plant Truck S-41  |
January 7, 2008
|
No |
No |
No |
3Hilltop Chevrolet |
RFP #34-08 Fundamental Building Systems Commissioning
Fire Station II  |
January 4, 2008
|
Pre-Proposal meeting canceled see ADD#1
|
Pre-Proposal meeting is Dec. 20, 2007 at 11:00 a.m.
|
Addendum #1 |
Cornerstone Commissioning |
|
2007 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting |
Addenda |
Bid Summary / Award |
RFP#08-08 - MIDDLE SCHOOL DESIGN ALTERNATIVES PROFESSIONAL SERVICES  |
December 7, 2007
|
This RFP is open only to firms pre-qualified through RFQ 08-08 below
|
November 19, 2007
|
Addendum #1 |
JCJ Architects |
RFQ#08-08 A/E Development of Design Alternatives for the Portsmouth Middle School  |
September 27, 2007
|
No
|
No
|
Addendum #1 |
List of Firms |
Bid #37-08 POLICE DEPARTMENT VEHICLES  |
December 18, 2007
|
No
|
No |
No |
Portsmouth Ford Used Car Center |
Mechanic Street Pumping  |
December 20, 2007
|
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package.
|
December 10, 2007 @ 9:00 a.m. |
Addendum #1 |
Keymont Construction |
RFP #28-08 Scum & Grease Removal  |
December 12, 2007
|
No
|
No |
No |
Stewart's Septic Service |
RFP #27-08 Snow Removal Services  |
December 3, 2007
|
No
|
No |
No |
Various |
BID #15-08 Market St. Sidewalk Project  |
November 27, 2007
|
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package.
|
|
Addendum #1
Addendum #2
Addendum #3 |
|
BID #17-08 Police Department Dehumidification System  |
November 20, 2007
|
Please contact Lori MacGinnis to pre-register to attend pre-proposal meeting: (603) 610-7227.
|
Mandatory pre-bid meeting is November 15, 2007 at 10:00 a.m. |
Addendum #1 |
Granite State Plumbing & Heating |
RFP #19-08 Madbury Water Treatment Plant Upgrade - Value Engineering Review |
November 20, 2007
|
No
|
No |
No |
Metcalf & Eddy |
BID #22-08 School Department Tractor |
November 19, 2007
|
No
|
No |
Addendum #1 |
Shaw’s Ridge Equipment |
RFP #21-08 Engineering Services CSO-Long Term Control Plan Projects |
November 14, 2007
|
No
|
Pre-proposal meeting is October 30, 2007 at 10:00 a.m. |
No |
Underwood Engineering |
RFP #20-08 Engineering & Design Services Sagamore Ave South Sewer Extension  |
November 14, 2007
|
No
|
Pre-proposal Meeting is October 30, 2007 at 9:00 a.m. |
No |
Wright-Pierce |
Bid #25-08 Police Dept. Ammunition |
October 22, 2007
|
No
|
No
|
No |
Eagle Point Gun |
Bid #23-08 Police Dept. Vehicles |
October 19, 2007
|
No
|
No
|
No |
BIDS REJECTED |
Bid #24-08 Police Cruiser Laptops |
October 18, 2007
|
No
|
No
|
No |
TransCorp |
Bid #36-07 High Hanover Parking Facility Stairtower Roof Project |
See Addendum #4 |
Questions may be directed to Lori MacGinnis at (603) 610-7227.
|
No |
Addendum #1
Addendum #2
Addendum #3
Addendum #4
Addendum #5 |
Ricci Construction |
RFQ #12-08
CALL FOR ARTISTS
AFRICAN BURIAL GROUND |
October 4, 2007 at 1:30 p.m
|
No
|
No
|
Addendum #1
|
|
RFP #14-08 Design Market St. Extension Gateway Streetscape Improvements  |
October 4, 2007
|
No
|
No
|
Addendum #1
|
The Cecil Group |
RFQ #16-08 Construction Management Services Fire Station II |
October 3,2007 at 4:00 p.m.
|
No
|
No
|
Addendum #1
|
Baybutt Construction Managers |
RFP #07-08 Water Meter Replacement & Automated Meter Reading Deployment.  |
September 7, 2007
|
No
|
August 17, 2007 at 10:00 a.m.
|
Addendum #1 |
Datamatic Ltd. |
RFP #09-08 Parking Garage Access and Revenue Control
Program Upgrade  |
August 31,2007
|
No
|
|
|
McGann Associates |
RFP #06-08 Middle St. Sidewalk Project & Union St. Curbing.  |
August 28, 2007
|
No
|
No
|
|
Gove Construction |
RFP #11-08 Household Hazardous Waste Collection
 |
August 24, 2007 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package.
|
|
|
Care Environmental |
Bid #05-08 High/Hanover Parking Facility Maintenance Project |
August 23, 2007 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package.
|
|
|
G.S. Bolton |
RFP #04-08 Instrumentation & Scada Services |
August 23,2007 |
No |
August 8, 2007 at 9:00 a.m |
|
Electrical Installations |
Bid #03-08 New Castle Ave./Marcy St. Sidewalk |
August 15, 2007 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package |
No |
|
R.H. White |
Bid #02-08 Heavy Duty Street Sweeper |
July 30, 2007 |
No |
No |
|
Casey & Dupuis |
Bid #51-07 Sewer Division Truck with Sewer Cleaner  |
July 25, 2007 |
No |
No |
|
No award |
Bid #41-07 Dump Truck with Plow and Patrol Wing.  |
July 3, 2007 |
No |
No |
|
Freightliner of New Hampshire |
RFP #49-07 Engineering Inspection and Evaluation of Portsmouth Seawalls  |
June 27, 2007 |
Seawall Maps |
No |
|
Water Front Engineers |
Bid #01-08 Annual Fuel Bid  |
June 25, 2007 |
No |
No |
Addendum #1 |
Hometown Oil, Hanscom's Truck Stop, Dennis K. Burke and Global Montello Group |
Bid #50-07 Police Cruisers  |
June 22,2007 |
No |
No |
Addendum #1 |
Herb Chambers |
Bid #48-07 Bicycle Route Improvement Projects |
June 15, 2007 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package |
No |
Addendum #1
|
Markings Inc. |
RFP #43-07 Annual Services Contract - Generator Systems |
June 13, 2007 |
No |
No |
Addendum #1
Addendum #2 |
Power Up Generator |
RFP # 08-07 Canoe/Kayak Dock Project Design Build. |
June 13, 2007 |
No |
May 31, 2007 at 1:00 p.m. |
Addendum #1
Addendum #2 |
Pickering Marine |
RFP #21-07 Action Plan for Islington Street Corridor and Arts District Plan  |
June 11, 2007 |
No |
No |
|
Richardson & Associates |
RFP #45-07 Parking Enforcement and Violations Management Program  |
May 15, 2007 |
No |
No |
CLARIFICATION QUESTIONS AND ANSWER |
T2 Systems |
Bid #42-07 Pavement Markings  |
May 4, 2007 |
No |
No |
No |
Markings Inc. |
RFP #37-07 Fire Station Statue  |
May 2, 2007 |
No |
No |
No |
Emile Birch |
RFP #39-07 MECHANIC STREET PUMPING STATION ELECTRICAL UPGRADE  |
May 1, 2007 |
|
Mandatory pre-proposal meeting on
April 17, 2007 at 10:00 a.m. |
No |
Wright-
Pierce |
Bid #40-07 2WD ½ Ton Pick Up Truck  |
April 30, 2007 |
No |
No |
No |
Ron Currier's Chevrolet |
Bid #19-07 Highway Loader |
April 23, 2007 |
No |
No |
No |
Chadwick-BaRoss Inc. |
BID #35-07 Annual Paving  |
April 12, 2007 |
No |
No |
No |
Pike Industries |
RFP #38-07 Library Sale of Surplus Book Shelving |
March 27, 2007 |
No |
March 21, 2007 at 10:00am |
No |
No bids received |
RFP #32-07 Congress Street Sidewalk Project |
March 26, 2007 |
No |
March 13, 2007 at 11:00am |
Addendum #1 |
R.H. White Construction |
RFP #30-07 Ground Lease and Redevelopment of the Old Public Library |
May 16, 2007 |
No |
March 14, 2007 at 1:30pm |
No |
Portsmouth Historical Society |
RFP #34-07 Annual Chemicals for Swimming Pools |
March 16, 2007, 2007 |
No |
No |
No |
Fillion Associates |
Bid #28-07 Sale of Surplus Vehicles |
February 28, 2007 |
No |
No |
No |
Various |
Bid #31-07 Downtown Street Lights |
February 22, 2007 |
No |
No |
Addendum #1 |
Rexel/CLS |
RFP # 25-07 Wastewater Facilities Plan Update and Combined Sewer Overflow |
February 23, 2007 . |
No |
Pre-proposal meeting is Feb. 6, 2007 @ 10:00 a.m. |
No |
|
BID # 24-07 Water Inventory |
January 26, 2007 |
No |
No |
No |
Various |
BID # 20-07 Annual Chemicals |
January 25, 2007 |
No |
No |
Addendum #1 |
Various |
RFP #26-07 Police Dept. Indoor Firing Range Wall & Baffle Upgrade |
January 5, 2007 |
Please contact Karen Senecal to attend pre-proposal meeting at (603) 610-7400 |
Mandatory prebid meeting: December 21, 2006 at 9:00am |
No |
Deschenes Acoustics
|
Borthwick Avenue Sewer Upgrade |
January 12, 2007 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package |
Mandatory prebid meeting: December 20, 2006 at 9.00am |
Addendum #1 |
D&C Construction |
|
2006 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting |
Addenda |
Bid Summary / Award |
RFP # 23-07 Sewer Inventory |
December 15, 2006 |
No |
No |
No |
Various |
RFP # 18-07 African Burial Ground Design and Engineer Services |
December 14, 2006 |
No |
pre-proposal meeting: November 30, 2006 at 10:00am. |
Addendum #1 |
Various |
RFP # 22-07 Library Interior Signage |
December 4, 2006 |
No |
No |
No |
Advantage Signs |
RFP # 16-07 Snow Removal Services |
November 1, 2006 |
No |
No |
No |
Various |
RFP # 17-07 Police Van |
October 26, 2006 |
No |
No |
No |
Grappone Ford |
RFP # 13-07 Type III Ambulance |
October 24, 2006 |
No |
No |
No |
Specialty Vehicles |
RFP # 12-07 Demolition of Islington St. Water Tank |
October 23,2006 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package |
No |
Addendum #1, please contact Lori MacGinnis at (603) 610-7227 |
Rexel/CLS |
RFP # 07-07 Engineering & Design Services Raleigh Way Streetscape |
September 28, 2006 |
No |
Pre-bid meeting on September 18, 2006 at 2:00pm |
No |
CLD Engineers |
Bid # 05-07A Re-bid of Shelving |
September 6, 2006 |
Interested vendors must contact Lori MacGinnis at (603) 610-7227 for a bid package |
No |
No |
Donnegan Systems, Inc. |
RFP #10-07 Market Street - Bicycle & Pededstrian Path |
August 31,2006 |
No |
No |
No |
Gorrill Palmer |
RFP #09-07 - Engineering Services I-95 Exit 7 (Market St.) Interchange Improvements |
August 31, 2006 |
No |
No |
No |
Gorrill Palmer |
Fund Management Services |
August 31, 2006 at 4:00pm |
No |
No |
No |
|
Bid -Pleasant Point Sewer Extension |
August 22, 2006 |
To Obtain Plans & Specs, Please call Lori MacGinnis at (603)-610-7227 |
August 15, 2006 at 10:00am |
Addendum #1 |
North Hampton Excavating |
Bid #06-07 - Elevator Service Maintenance |
August 9, 2006 |
No |
No |
No |
Stanley Elevator |
Bid #04-07 - Portsmouth Public Library Moving Services |
August 8, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227
for a bid package |
July 17, 2006 at 1;00p.m. |
No |
William B. Meyer |
Bid #05-07 - Portsmouth Public Library Shelving |
July 24, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227
for a bid package |
No |
No |
Bid 05-07 not awarded, rebid as 05-07A |
Bid #03-07 - Portsmouth Public Library Furnishings |
July 19, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227
for a copy of bid specs. |
No |
No |
Union Office
Interiors |
Bid #33-06 - Engineering & Design Services Madbury Water Treatment Plant Upgrade |
July 14, 2006 |
No |
Mandatory Pre-bid meeting is June 22, 2006 at 10:00am |
No |
|
RFP #01-07 Annual Fuel |
June 26, 2006 |
No |
No |
No |
G Dennis K.
Burke and Hometown Oil |
RFP #02-07 New Library Access Security |
June 21, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227 for specs & plans. |
Mandatory pre-bid meeting is June 14, 2006 at 11:30am. |
No |
American Alarm |
Bid #65-06 - Police Department Mobile Data Computers |
June 19, 2006 |
No |
No |
Addendum #1 |
Transcor |
Bid #63-06 - Police Department Indoor Training Firing Range UPgrade |
June 19, 2006 |
No |
Mandatory Pre-bid meeting is June 9, 2006 at 10:00am |
No |
|
Bid - Lower Court Street Reconstruction |
June 16, 2006 |
Prequalifications due May 24, 2006. Contact Lori MacGinnis 603-610-7227 for more information. |
Mandatory Prebid June 6, 2006 9:00am |
Addendum #1 |
Gove
Construction |
Bid #64-06- Police Department Recording System |
June 15, 2006 |
No |
No |
Addendum #1
Addendum #2
Addendum #3
Addendum #4 |
Exacom |
Bid #50-06 - South & Miller Intersection Signal Improvements |
June 15, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227. |
No |
Addendum #1
Addendum #2 |
New England Signals |
Bid #48-06 - DOWNTOWN INTERMODAL TRANSPORTATION CENTER AND
SIDEWALK IMPROVEMENT PROJECT HANOVER AND HIGH STREET |
June 12, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227. |
Mandatory Prebid meeting is June 5, 2006 at 10:30am |
Addendum #1 |
Santorelli Construction |
Bid #29-06 - Crescent Way Improvement Project, Atlantic Heights Streetscape |
June 9, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227. |
Mandatory Prebid meeting is June 2, 2006 at 10:00am |
No |
Gove Construction |
Bid #53-06 - High Hanover Garage Security Guard |
May 19, 2006 |
No |
No |
No |
Reliable Security |
Bid #55-06 - Middle & Haven Road Sidewalk Improvements |
May 12, 2006 |
Interested vendors must contact Lori MacGinnis at 603-610-7227. |
No |
No |
John Lyman & Sons |
Bid #39-06 Residential Water Conservation Kits |
May 8, 2006 |
No |
No |
No |
Niagra Conservation Group |
Bid #57-06 New Castle Avenue Roadway |
April 28, 2006 |
No |
Mandatory pre-bid meeting is April 13, 2006 at 10:00am |
Addendum #1
Addendum #2 |
D & C
Construction |
Bid #58-06 - Voice and Data Cabling for the Library |
April 20, 2006 |
To obtain plans/drawings for this bid, please Contact Lori
MacGinnis, 603-610-7227. |
Mandatory Prebid meeting is April 13, 2006 at 10:00am |
No |
Computer
Cable
Company |
Bid #52-06 - Pavement Markings |
April 13, 2006 |
No |
No |
No |
Markings Inc. |
Bid #49-06 - Annual Paving Project |
April 12, 2006 |
No |
No |
Addendum #1 |
Pike Industries |
Bid #54-06 - Plumbing and Heating Repair Services |
March 31, 2006, 2006 |
No |
No |
No |
Pettigrew |
Bid #56-06 - Police Dept. Scott SWAT-PAK SCBA FR Respirators |
March 28, 2006, 2006 |
No |
No |
No |
Fisher
Scientific |
RFP #51-06 - Storm Water Master Plan Project |
March 17, 2006, 2006 |
No |
March 3, 2006, 2006 at 1:30pm |
No |
Edwards &
Kelcey |
RFP #40-06 - Public Works Plotter/Scanner |
March 15, 2006, 2006 |
No |
No |
No |
Topaz Eng. |
RFP #46-06 - Aerial Photography and Related Professional Services |
March 13, 2006 |
Interested vendors
must contact Lori MacGinnis at (603) 610-7227 |
|
No |
Brad
Street |
Bid #03-06
Maple Haven Park Playground Equipment |
March 8, 2006, 2006 |
Interested vendors
must contact Lori MacGinnis at (603) 610-7227 |
No |
Addendum #1
|
O’Brien |
Bid #37-06
Maple Haven Park Site Work |
March 8, 2006, 2006 |
Interested vendors
must contact Lori MacGinnis at (603) 610-7227 |
No |
Addendum #1 |
Farnese Const. |
RFQ #41-06 - Architectural & Engineering services for the Conceptual design and planning of Ports. Department Station |
March 7, 2006, 2006 |
No |
No |
No |
|
RFP #38-06 - Revision of Zoning Ordinance, Site Review & Subdivision regulations |
March 1, 2006, 2006 |
No |
No |
No |
Taintor and Assoc. |
RFP #36-06 - Marine Unit Fire Fighting Vessel |
February 17, 2006 |
No |
No |
No |
Metalcraft |
Bid - Deer Street Pumping Station Improvements |
February 16, 2006 |
No |
Mandatory prebid meeting January 19, 2006 at 10:00am |
No |
Keymont Const. |
Bid #35-06 - Sale of Surplus Vehicles |
February 10, 2006 |
No |
No |
No |
Various Awards |
Bid #26-06
New Castle Ave. Roadway and Seawall Project |
February 10, 2006 |
Interested vendors
must contact Lori MacGinnis at (603) 610-7227 |
Mandatory pre-bid meeting is January 30, 2006 at 10:00am |
Addendum #1
Addendum #2
Addendum #3
Addendum #4
Addendum #5 |
Rejected - rebid as #57-06 |
RFP #32-06
Engineering & Design Services Pleasant Point Area Sewer Extension |
February 2, 2006, |
|
Mandatory Pre-proposal Meeting January 19, 2006 at 1:30pm |
Addendum #1 |
Dufresne-Henry |
Bid #30-06-
Shoreline Repairs Prescott Park and Four Tree Island |
January 31, 2006 |
Interested vendors
must contact Lori MacGinnis at (603) 610-7227 |
Mandatory pre-bid meeting January 23, 2006 at 2:00pm. |
Addendum #1 |
Jaime
Construction |
Bid #34-06 Water Inventory |
January 27, 2006 |
No |
No |
No |
Various
Vendors |
Bid #31-06- Annual Chemicals |
January 26, 2006 |
No |
No |
Addumium # 1  |
Various
Vendors |
LINCOLN AVE. AREA SEWER SEPARATION - CONTRACT #2 |
Pre-
qualification deadline is Jan. 25, 2006 |
Interested vendors
must contact Lori MacGinnis at (603) 610-7227 |
No |
No |
Park Const. |
Bid #28-06
Professional Services City-Wide Overtime Audit |
January 6, 2006, |
No |
No |
YES |
Matrix |
|
2005 |
| Bid/Proposal |
Deadline
(for time see Bid/Proposal Document) |
Additional
Instructions |
Pre-bid Meeting |
Addenda |
Bid Summary / Award |
Bid #27-06
Police Dept. Update Access Control  |
December 30, 2005 |
Interested vendors must contact Communications Supervisor Gil Emery at (603) 610-
7411 to confirm attendance at the pre-bid meeting. |
Mandatory Pre-bid meeting is December 19, 2005 2:00pm. |
Addumium # 1 
Addumium # 2 
Addumium # 3  |
Diebold |
Bid #25-06
Sewer Inventory |
December 16, 2005 |
No |
No |
No |
John Hoadley & Sons,
Public Works Supply,
Ti-Sales,
Vellano Bros.,
Women Waterworks Supply |
Bid #23-06
Water Meters Inventory |
November 23, 2005 |
No |
No |
No |
AMCO, Toomey, Neptune, Ti Sales |
Bid #24-06
Snow Removal Services |
November 15, 2005 |
No |
No |
No |
Gove, Health/ Wealth Ent., W. Renaud Trucking |
Bid #21-06
Skid-Steer Loader |
November 1, 2005 |
No |
No |
No |
Southworth
-Milton
Caterpillar |
Bid #13-06
Annual Tree Work |
October 14, 2005 |
No |
No |
No |
Urban Tree |
RFP #12-06
Water Source Augmentation Greenland Well  |
October 13, 2005 |
No |
Yes |
YES |
Underwood/ Emery & Garrett |
Bid #05-06
Madbury Water Plant Gates |
October 7, 2005 |
No |
No |
No |
Gc/AAA Fence |