Pavement Management Index
The City of Portsmouth has hired Vanasse Hangen Brustlin, Inc (VHB) annually to perform an update to the City’s pavement management system. This project is part of an on-going program where the city road conditions are evaluated periodically, the road network conditions and budget requirements are analyzed, and road paving programs are developed.
In the summer of 2018, VHB resurveyed the pavement condition of 25.1 miles of Portsmouth’s total 104.2-mile, City-maintained road network. By hiring VHB to resurvey 25% of the City’s roads each year and updating the roads where maintenance and resurfacing has been performed, Portsmouth has maintained an up-to-date Pavement Management System.
Under the scope of this project, VHB performed a detailed inspection of the condition of the pavement on the City maintained roads and has created a database of this information which can be viewed, edited and analyzed using VHB’s RoadManager™ software. VHB will deliver this database to staff in the Public Works Department. The data is linked to the City’s Geographic Information System (GIS), so that thematic maps can be created to display any of the information in the database.
This report describes the steps taken in this project, the results of the field evaluations, and compares the results of potential roadway funding scenarios.
2020 Paving Projects
The following roads will receive pavement management pending available funds and resources.
Project Manager: Dave Desfosses, Construction Technician Supervisor 766 - 1411
-
Gosling Road
-
Banfield Road
-
Little Harbor Road
-
Dennett Street
-
South Street
-
Greenland Road
-
Bow Street
-
Corporate Drive
-
International Drive
Crack Sealing
The City crack seals its roads to prevent water from penetrating the road surface. This in turn keeps the road from failing so rapidly which helps the City save money while still maintaining a smooth surface for the traveling public.
Status: Scoping for 2020 underway
Project Manager: Ryan Flynn, Construction Project Coordinator 766 - 1413
Estimated Start Date: Spring 2020
Estimated Time of Completion: Fall 2020
Estimated Cost: $75,000
Funding Source: Roadway Maintenance Funds
Designer/Contractor: TBD