CITYWIDE CONSTRUCTION PROJECTS

Project #1: Leslie Drive Drainage Outfall

Update 5/7/15: This project is now complete.

Project Description: This project involves the reconstruction of the Leslie Drive Drainage Outfall. The existing 8" diameter clay pipe will be broken apart with a hydraulic bursting head and a new 12" plastic pipe will take its place essentially doubling the capacity of the pipe. A double grated drainage basin will be installed at the low spot of the road and all the remaining drains will be reconnected to the system.

Project Manager: Dave Desfosses 766-1411
Estimated Start Date: Spring 2015
Estimated Time of Completion: 120 Days
Estimated Cost: $50,600
Funding Source: Capital/Water Revenues
Contractor: Ted Berry Company

 